PATRIOTPOOLS Plan your pool
Shotcrete being sprayed into a pool shell

How we build

The phase where your pool comes to life.

From the plans to the fill, the same crew and the same standard at every step.

  1. 01

    Plans

    The pool, the spa and every setback drawn out before anything is dug.

    “Where luxury begins, long before the water.”

    Pool and spa plans with rear and garage setbacks marked
  2. 02

    Site prep and steel

    With all the rain, the rebar cage has to stay clean: washed in dirt is pulled out and every bar left exposed so the shell bonds the way it should.

    “This is the part only our customers see.”

    Clean, exposed rebar cage in a pool dig
  3. 03

    Shotcrete

    Concrete day. Shotcrete is sprayed over the steel to form the shell.

    “Shotcrete! The phase where your pool comes to life.”

    Shotcrete nozzle spraying the pool shell
  4. 04

    Tile and coping

    Glass mosaic and 1x1 tile waterlines, crisp coping and stone decking set by hand.

    Glass mosaic tile and coping on a raised spa wall
  5. 05

    Plaster

    NPT StoneScapes and Jewelscapes finishes, applied by the Patriot crew.

    Plaster crew finishing a pool interior
  6. 06

    Water

    Fill day, start up and chemistry. Then the pool joins our maintenance route, and the warranty stays with us.

    The finished Tuxedo Black pool full of water

Maintenance

Designed to be felt, not flaunted.

Weekly service from the same people who build the pools. No corner left unserviced.

  • Weekly serviceChemistry, brushing, skimming and filter cleans
  • Green pool recoveryAlgae and high phosphate treatments, done fast
  • Equipment and lightingRepairs and full system upgrades
  • Leak detectionPressure testing and lasting repairs
  • RenovationsPlumbing, plaster, tile and equipment brought back to life
Ask about maintenance
Patriot Pools technician brushing a modern water feature